Skip the grid queue. Dispatchable baseload power behind your meter, operating in 2027.

Grid interconnection for large loads in Ontario now exceeds five years. Public Energy delivers commercial operations in approximately 18 months. Modular 1MW packages, behind your meter, scaling from 10 to 100 MW. We own and operate every site, so you focus on running the data center. Size yours below.

01 · Size your package

Sizing tool

Size your behind the meter package

Drag the slider to size a Public Energy package for your data center. Indicative Year 1 (2027) pricing based on 8,000 hrs/yr baseload operation.

10MW

Modular 1MW packages · scalable from 10 to 100 MW

Generator packages
10
1MW each
Annual generation
76,440
MWh / year
Time to power
~18
months to COD
Contract term
20
years, CPI
CO2e (all-gas)
40,513
tonnes / year

Four commercial structures

Option A
Customer-supplied gas
$67.50/MWh
non-fuel tariff only
$429,975 / mo
You handle gas and carbon
most flexible
Option B
Pass-through gas + carbon
$113/MWh
Year 1 all-in, gas at cost
$717,284 / mo
No carbon liability at this size
Option C
Hedged gas + carbon
$122/MWh
gas locked 20-yr
$774,746 / mo
No carbon liability at this size
no carbon liability
Option D
RNG blend, no carbon
$113/MWh
sized to stay under EPS
$717,284 / mo
No RNG needed at this size, no carbon

Pricing is indicative and subject to site-specific engineering, gas pricing at financial close, and contract terms. Year 1 = 2027. Carbon liability calculated under Ontario EPS using performance standard 0.310 tCO2e/MWh (with stringency decline) and 2027 carbon price of $125/tCO2e (path $110 to $170 from 2026 through 2030). Carbon applies only when annual emissions exceed 50,000 tCO2e. RNG blend share is calculated to keep emissions below this threshold and scales with project size. Final pricing confirmed in term sheet.

02 · The case

Why this beats
waiting.

  1. 01

    No interconnection queue.

    Grid interconnection for large loads in Ontario now exceeds five years. Our packages sit behind your meter, with no IESO queue, no transmission upgrade dependencies, and no shared cost allocation to other utility customers.

  2. 02

    Owned and operated.

    Public Energy owns, operates, and maintains the generation packages on your site. We handle gas supply, dispatch, scheduled maintenance, and 24/7 monitoring. Power lands at your demarcation point. You focus on the data center.

  3. 03

    Modular and scalable.

    Modular 1MW reciprocating engine packages. Phase in as load grows. Built-in N+1 redundancy without paying for unused capacity. Scale from 10 to 100 MW as your facility expands.

  4. 04

    Carbon strategy built in.

    Choose pass-through gas, hedged gas, or an RNG blend sized to keep emissions below the 50,000 tCO2e Ontario EPS threshold. Operator-proven technology from a company that runs six distributed generation facilities in Ontario today.

03 · Time to power

How fast
is fast.

Months from contract signing to commercial operation. Public Energy delivers in roughly one-third the time of grid interconnection.

  • Public Energy package
    18mo
  • Fuel cells
    24mo
  • Aero-derivative gas turbine
    30mo
  • Grid interconnection (Ontario IESO queue)
    60mo
  • New-build nuclear SMR
    96+mo

Months from contract signing to commercial operation. Industry composite; grid figure reflects Ontario IESO queue averages for large-load interconnection studies.